TEAM BACKGROUND
Client / Owner: DRAGADOS OFFSHORE – LINDE / STATOIL
Location: Dragados Offshore Yard at Puerto Real (Cádiz) SPAIN.
Description: Snohvit Project. LNG plant for Hammerfest (Norway). 24.000 t/y capacity processing plant topsides construction over an 8000 m2 barge, for later transport to the LNG terminal at Melkoya island (Norway).
Services:

  • Construction management.
  • Modularization.
  • Seafastening supervision (DNV)
  • Structure calculation.
    • Transient states, fabrication, transport and assembly manoeuvers.
    • Structural connections.